When do you need an expert delay report?
You need one when the delay is large, the programme is disputed or the claim may go to adjudication, arbitration or court. For small delays, a clear programme comparison and good records are often enough.
What an expert does
A delay expert studies the programmes, records and events. The expert shows which events delayed completion and by how many days. The report can then support an extension of time or a delay cost claim.
Different methods exist, and the right one depends on the records available.
Signs you may need one
- The claim is for a large sum or a long delay.
- Both sides blame each other for the delay.
- Several delay events overlap.
- The programme was changed many times.
- You expect a formal dispute.
Get the records ready
An expert can only work with what you give them. Supply the baseline programme, every update, the site diaries, the instructions and the correspondence. Missing records cost time and money.
Appoint the expert early. A late appointment gives less time to test the findings. A claims consultant or lawyer can help decide if a report is worth the cost.
Related answers
Questions
How much does an expert report cost?
Cost depends on the size and complexity of the dispute. Ask for a fixed scope and a fee estimate first.
Can I write the delay analysis myself?
For a small claim you can. For a dispute, an independent expert carries more weight.
Need this done for your project?